6/24/2023 0 Comments Smart bim library![]() ![]() ![]() So the later unforeseen events occur, the greater the impact on deadlines and costs. In addition, the planning processes of different equipment systems are often inadequately linked – either across disciplines or over the entire life cycle of the building. Too many players are involved and the interdependencies between project phases are too great. Visualisation of a heating group based on the Smart Actuator BIM modelĬonstruction projects are planning-intensive, often expensive, and usually not very agile. The database was recently supplemented with CAD and Revit model data for the Smart Actuator, as well as the new pressure-independent regulating valves. Since its introduction in 2017, SAUTER’s BIM library has been supporting architects, engineers and building planners, particularly in the HVAC sector, in projects spanning the entire building cycle. 18 фебруара 2022 | Aktuelne vesti New models in SAUTER’s BIM libraryĭigital building planning based on BIM (Building Information Modeling) is now standard. ![]()
0 Comments
Leave a Reply. |